Worked Projects
Worked Projects
Works Carried Out:
1. Mitigation:
First action in disaster response.
The water is extracted, humidity is controlled, and the equipment that is used in the production process is protected. For later demolition.
2. Water Damage:
Handling of specialized equipment for drying and draining water in buildings.
Knowledge of self-care in handling electrical equipment in wet or humid areas.
3. Mold Remediation:
Treatment of biodegradable agents affected areas
Area of Operations:
- Children´s Hospital (New Orleans)
- Louisiana Supreme Court (New Orleans)
- Schools (New Orleans)
- The University Of New Orleans
- Liberty Bank
- The Saulet Apartments
160 Workers:
-Supervisors
-Labors
-Skill Labor
-Construction Workers
Works Carried Out:
Mitigation:
First action in disaster response.
The water is extracted, humidity is controlled, and the equipment that is used in the production process is protected. For later demolition.
Water Damage:
Handling of specialized equipment for drying and draining water in buildings.
Knowledge of self-care in handling electrical equipment in wet or humid areas.
Mold Remediation:
Treatment of biodegradable agents affected areas.
Area of Operations:
- Store Chain (Home Depot, Walmart stores)
- Boca Raton Regional Hospital
- Orlando Airport International
- Citadel Of Elders
Works Carried Out:
The train crash is the largest chemical spill in U.S. history.
The factory was affected. The walls were impregnated with chloride in such a high content that it was a lethal pollutant for human beings.
This involved gigantic logistics of materials and equipment.
Is a special feature of this work since it was a 2-story heritage building from 1910.
At this time, lead paints were used, and we had to train hundreds of people in asbestos and lead paint removal.
Area of Operations:
-Cotton Mills Factory
Works Carried Out:
- Debris removal
- Cleaning
- book boxing